Hello All- Here is update on the Century Village Construction Project:
This week, at the direction of our Engineer, the pathway for the new sidewalk was
re-staked by Surveyor, and elevation/slope defects were corrected by our General Contractor.
Next week, finish grading will be completed, followed by inspection by our Engineer.
Formation and pour of Concrete is expected to begin week of 12/1. Century Blvd.
exit lanes will be closed to traffic while the concrete is being poured.
Please check the CV BLOG (www.village-blog-and-chat.blogspot.com ) for latest updates
on road closures.
re-staked by Surveyor, and elevation/slope defects were corrected by our General Contractor.
Next week, finish grading will be completed, followed by inspection by our Engineer.
Formation and pour of Concrete is expected to begin week of 12/1. Century Blvd.
exit lanes will be closed to traffic while the concrete is being poured.