This Is our Village

Friday, February 1, 2013

HEAT EXCHANGERS INSTALLED - CLUBHOUSE INDOOR POOL OPEN

-
-
The Heat Exchanger project is complete.
The indoor pool is open for use at the main clubhouse.
-
Dave Israel
-


3 comments:

  1. We have been to the inside pool yesterday night (saturday) and the water was really cold, so we had to cancelled. How long it will take to heat it?

    ReplyDelete
  2. Hi Marc,
    February 3, 2013 at 9:23 AM,

    According to Eva, two days.

    Dave Israel

    ReplyDelete
  3. The water of the insie pool is still cold. I had check the stream with my arm and it is cold. Is there a problem or they only forgot to put the switch at on?

    ReplyDelete

Note: Only a member of this blog may post a comment.