This Is our Village

Showing posts with label CV Roadways and Infrastructure. Show all posts
Showing posts with label CV Roadways and Infrastructure. Show all posts

Thursday, July 28, 2011

Friday, May 27, 2011

DRAINAGE, ROADWAY REPAIR, ASPHALT - RESURFACING - TOWN HALL MEETING

-
Hi all,
There was a major briefing delivered this morning in the Clubhouse theater. The brief was delivered by our LCAM, an Engineer and by representitives from major contracting firms involved in the project.


This project involves eliminating flooding by repair of our Village drainage system, Rehabilitating our Perimeter Roadway and sidewalk system and repairing the asphalt surfaces across the entire Village as needed.
It is a three year project which will cost millions of our dollars.


This briefing was advertised well in advance and yet, only 35 unit owners attended; it was an embarrassment!


Such a level of apathy over the expenditure of such a large amount of money is difficult for me to understand. I would appreciate comments on this issue.
The good news is that the briefing was recorded and may be viewed at the following URL:


http://goo.gl/Iv0Ri

See also in the sidebar under heading Public Service Announcements - ROADWAY REPAIR- TOWN HALL MEETING.


The quality is not good, but hopefully, some of you will turn up the volume and tune in!


Dave Israel
President
United Civic Organization
-

Saturday, November 28, 2009

Breakaway Signs


Question for VP Marshall/UCO: How are our new street signs anchored to the ground. I would have thought hunk of concrete but this sign shows just metal pole, easily displaced.
At least someone did not crash the gate, however, the grass skid and sign show someone manage to drive at right angles to the flow of traffic. Maybe they came directly out of Windsor and across all lanes veering right! this is Okee 4-way, South & West Drives.
Posted by Picasa